02-04-2012: 3 hrs



K1000-3 nutplates arrived today, got them installed on the Z brackets except the most inboard one


Three K1000-3 nutplates will be installed on the spar web


I had to take the countersink stopper out for clearance when countersinking the two holes adjacent to the spar cab, I need to go very slowly here to avoid over countersinking


Rivet holes for the nutplate on the spar web are countersunk


The countersunk holes are primed, and nutplates are installed


Z brackets are bolted to the spar using two bolts for each bracket


Baffle is clecoed to fuel tank assembly


Fuel tank assembly is fitted to the spar


Fuel tank assembly is fitted to the spar


The gap between leading and tank skins is checked, it looks good


The gap between leading and tank skins is checked, it looks good