Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


02-08-2013: 1 hr


Finishing kit arrived


Finishing kit arrived


I marked a line that is 3" from the most inboard holes. The line will be used to trace back the hole position on the bottom fuselage skin overhang for wing root fairing




I marked lines 5/8" from the edges, the center area is the allowable location for the rear spar bolt


<<Previous |  Home | Next>>


Make a free website with Yola