Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


02-16-2014: 4 hrs


While still waiting for the hangar, I am trying to have much done as possible in the garage. I saw some builders did the wing tips after moving to hangar, I decided to tackle them now. So, I installed the landing/taxi light and position light to the left wing tip. Also cut the the wing tip cover for the lights. I used only two screws to fasten the wingtip cover, but it is a little loose. I will add two more screws later.



Part of the wingtip needs to be cut for landing and taxi lights. The cut off area is marked


Landing and taxi lights are assembled


Wingtip is cut for landing/taxi light assembly


Landing/taxi lights are installed to wingtip


Left nav light is installed


Electrical tape is used here. I might replace it with some real weather strip later


Wingtip lens is installed. I only used two screws for now. I may need to add more later

<<Previous |  Home| Next>>

Make a free website with Yola