Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-07-2013: 2 hrs




Elevator push rod is fabircated. I didn't do a good priming job here, but I am not worried about the small comsmetic details


Push rod is primed over entire length


Horizontal stab spacers are fabriated and primed as well

<<Previous |  Home | Next>>


Make a free website with Yola