Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-08-2013: 2 hrs




Rod end bearings on the elevators are installed


The horizontal stab skin has to be trimmed to clear the elevator counterweight as shown above


Area to be trimmed is marked


Horizontal stab skin is trimed, elevator is taped "in trail"


Horizontal stab skin is trimed, elevator is taped "in trail"


The position of the two elevator horns matches pretty well, though not exactly the same, which is not expected anyway


<<Previous |  Home | Next>>


Make a free website with Yola