Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-11-2013: 1.5 hrs




Vertical fin is mounted again, measurement is taken


Measurement on the left side


Measurement on the right side, same as the left side measurement. Vertical fin is "vertical" now

<<Previous |  Home | Next>>


Make a free website with Yola