Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-29-2013: 2 hrs





Picture of the firewall stiffener to bottom gusset rivet, I added one more rivet to firx the short edge margin problem. The fix was done long time ago, this is the picture to show the rivet for documentation


The painted covers


Nutplates are installed onto the covers


Heat baffle is riveted to the fwd cover


Air performance fuel pump and filter I got from Van's


Rubber cushion is installed, then the fuel pump and filter are installed to the cover using clamps


Covers are fitted to fuselage with fuel pump and filter installed


Another view of the installed pump and filter

<<Previous |  Home | Next>>


Make a free website with Yola