Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-30-2014: 4 hrs


Ailerons and pitot heater are installed.  Also did some wing tip wiring.



Aileron push rod and aileron stop is installed. I used nylon tube as the stop as many other builders did


Tank vent lines are fitted. I still need to tighten the fitting nuts


The cut out portion of the seat rib is screwed back



<<Previous |  Home| Next>>


Make a free website with Yola