Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-31-2014: 1.5 hrs




Push rods are connected to the bell crank. The bolts are torqued to spec



<<Previous |  Home| Next>>


Make a free website with Yola