04-11-2011: 2.5hr

Started working on front spar. Took me a while to understand the drawing. Clecoed and drilled the holes inboard of the bend line. The bend line is 5 3/16" from the center line. The taped line on HS710 and HS714 are drawn according to drawing. Used hacksaw to do the preliminary cut, followed by filing and scotch wheel. HS714 tapering is done, too late for HS710, will try to taper HS710 tomorrow.

 