Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


04-26-2012: 1.5 hrs

Center section bar and bar doublers are drilled today, the exposed length of the center section bar is 1-17/32" on both side.










Edge margin looks good


Spacers


I didn't pay much attention to the drawing, and chamfered the corner too much, but I think it will ok for the clamping load





<<Previous |  Home | Next>>


Make a free website with Yola