Shawn Li's RV-7 Construction Log
Home
Construction Log by Dates
Construction Deviation and Analysis
RV-7 In Action
Analysis
Phase I Log
On Going Maintenance
Maintenace Info
04-26-2012: 1.5 hrs
Center section bar and bar doublers are drilled today, the exposed length of the center section bar is 1-17/32" on both side.
Edge margin looks good
Spacers
I didn't pay much attention to the drawing, and chamfered the corner too much, but I think it will ok for the clamping load
<<Previous
|
Home
|
Next>>
Make a
free website
with
Yola