Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


04-24-2012: 1.5 hrs

Started working on F705 bulkhead today. Just trim the F705B to length, and fabricated F605C doubler. I don't have a working band saw, have to do rough cut on F605C using hacksaw. That slows down the process quite bit. After hacksaw, file, scotchbrite wheel, the doublers are done.




<<Previous |  Home | Next>>


Make a free website with Yola