Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


04-27-2011: 2 hrs

Deburred and smoothed VS-704, final drilled all skin attaching holes and rib to spar attahcing holes. Need to disassemble tomorrow if I get some time. Reading the drawing, the bottom holes at the rear spar need to be dimpled/countersunk on the forward sides. Need be careful.









<<Previous |  Home | Next>>



Make a free website with Yola