Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


06-28-2013: 3 hrs


Worked on side skirts. Drilled side skirts to frame, and drilled canopy to skirts on the left side to #30. Results looked good to me. No crack so far. I was worried about cracking the canopy using regular #30 drill bit.


Left skirt is drilled to canopy frame


Side skirt is drilled to canopy, the edge margin on canopy goods good, and no cracks


Close-up view of the holes on canopy


Side skirt brace is drilled to frame. The holes look good


Everythng is clecoed together on left side



<<Previous |  Home| Next>>

Make a free website with Yola