Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


07-08-2012: 3.5 hrs




The gap between the crotch strap brackets varies, depending on what harness you are going to use. I probably will use Crow straps, but I am not sure what is the proper gap. So I will just position the  aft brackets for now. The ribs are match drilled with the aft crotch strap brackets


The fwd flange of the seat rib is cut for the wireing bushing


The aft flange is cut for wiring bushing, look pretty good


Seat ribs are primed



<<Previous |  Home | Next>>


Make a free website with Yola