Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


07-14-2012: 1.5 hr

All seat and baggage ribs are riveted to F705 bulkhead. Overall, it is good. There are two places that the sheet metal on the shop head side bent up a little due to the bucking pressure (I may need reduce the pressure on the rivet gun) The gap at rivet location is small, and structurally it would be ok, I just leave the way they are. I standed the whole assembly for riveting, I found it is easier to rive this way than laying the assembly down on the table. After that, the AN3 bolts going through the seat ribs and F704 bulkhead are torqued to 25in-lb


Baggage ribs are clecoed on













<<Previous |  Home | Next>>


Make a free website with Yola