Shawn Li's RV-7 Construction Log
Home
Construction Log by Dates
Construction Deviation and Analysis
RV-7 In Action
Analysis
Phase I Log
On Going Maintenance
Maintenace Info
07-13-2012: 1.5 hrs
I am done with riveting the seat ribs to F704 center bulkhead. I slipped the bulking bar and dented the bulkhead web. I had to drill out one rivet and smooth out the rib. The end result was good.
Need sand more to remove the dent
After remove the dent, I primed the surface
Shop heads look good
F705 bulkhead is clecoed
<<Previous
|
Home
|
Next>>
Make a
free website
with
Yola