Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


08-11-2013: 1 hr


Spent some time on the engine control bracket and instrument panel today. The pictures should say it all.



Engine control bracket is drilled to instrument panel



USB port is cut on instrument panel


<<Previous |  Home| Next>>

Make a free website with Yola