Shawn Li's RV-7 Construction Log
Home
Construction Log by Dates
Construction Deviation and Analysis
RV-7 In Action
Analysis
Phase I Log
On Going Maintenance
Maintenace Info
08-12-2013: 2 hrs
I realized I haven't installed the doubler for the fuel line penetration on firewall, so I worked on that today. The location on drawing OP-32 is interferencing with the master relay leg. I had to lower the doubler.
<<Previous
|
Home
|
Next>>
Make a
free website
with
Yola