Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


08-12-2013: 2 hrs


I realized I haven't installed the doubler for the fuel line penetration on firewall, so I worked on that today. The location on drawing OP-32 is interferencing with the master relay leg. I had to lower the doubler.



<<Previous |  Home| Next>>

Make a free website with Yola