Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


08-28-2012: 3.5 hrs

Tonight is pretty productive. I got all brake pedals riveted. I debated a bit if I need to prime and paint the pedal assembly before riveting. I decided I would rivet it now, and prime and paint it later if needed. Or I will just leave them as is. I don't think corrosion will be a big concern for the brake pedals. The pedal assemblies turned out pretty good.


All brake pedals are ready to be riveted




All riveted





<<Previous |  Home | Next>>


Make a free website with Yola