Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


08-30-2012: 0.5 hr

Short night in the garage. I decided to buy a table press drill to drill the rudder block to make sure I have a straight drill. So I will not work on the rudder today. Instead, I clecoed on the baggage side ribs to the fuselage assembly. Also, I drilled the gear attach web to the side skin and stiffener. I will leave drilling the gear attachment web to lower longerons to a later time, when bottom skin is clecoed. on



I need to clecoe the F623 outboard baggage rib to the fuselage


Rib clecoed


Gear attach web drilled


Top row rivet (bottom in the picture) holes of gear attach web are drilled


Close up view of the drilled holes, edge margin is good


<<Previous |  Home | Next>>


Make a free website with Yola