Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


09-14-2013: 4 hrs


I reaized if I rivet the overhang trim piece to the main roll bar fairing piece, the edge margin will be less than desirable. Since the overhang trim piece is not really structural, I decided to glue them together using pro-seal that I have left over. Fine tuned the shape of the trim pieces, prepared them and glue them together. I will not touch them until the pro-seal is fully set. Hope this will work out all right








<<Previous |  Home| Next>>

Make a free website with Yola