09-27-2013: 0.5 hr


Looking for things to do before engine arrives. I riveted the fuel fitting doubler for firewall penetration using MS-319-BS pop rivets. I was thinking of using solid rivets for that, but access to two of the rivets is not great due to the engine mount. It looks good though with MS319BS. Then I reinstalled the relay that I took off earlier to install the fuel fitting doubler.