Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


09-29-2011:



I used a bolt to center the drain flange for match drilling to the skin


Here is the drain flange with the bolt


Skin is match drilled and clecoed


I also started dimpling the skin today



[Previous]    [Next]

Make a free website with Yola