Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


09-28-2011:


Access plate position is marked using the access plate attaching ring


Access plate is clamped to the rib, ready to drill the screw holes using the plate as a guide


The rib is drilled using the access plate as a guide, then clecoed the ring onto the rib, drill the nutplate rivet attaching holes.


Fuel cap is used as a guide to drill the cap flange. A clamp is used to hold the cap flange while drilling the first few holes


Fuel cap flange is drilled


   [Previous]    [Next]

Make a free website with Yola