10-28-2013: 1.5 hrs


Engine control cables forward bracket is fabricated today.


Nutplates are installed on the forward engine control bracket


It is not very clear from this picture, the cables are routed through the fwd bracket


Cables routed through fwd bracket. Right side of the picture is fwd direction