Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


11-15-2013: 2 hrs




Prop governor bracket is installed, I have to cut the safety wire, re-clock the control arm, then install the bracket to make the control working


The top governor bracket hole in this picture had to be elongated slightly to fit 



Safety wire installed to the screws


Prop governor is installed to the engine


Another view of the governor control bracket


There is a sharp turn of the prop control cable which I don't like, I will inspect it frequently


Another view


Yet another one


<<Previous |  Home| Next>>

Make a free website with Yola