11-16-2013: 3 hrs




The control arm still need some adjustment, I had to cut the safety wire and remove the bolt that locks the control arm in position


Control arm is re-clocked, and safety wire is installed


The control worked well after re-clocking the control arm


Here is the control linkage after the governor is installed to engine


Prop control worked pretty well now


Another shot of the governor with control linkage hooked up




Manifold pressure fitting is installed on #3 cyclinder


Oil return line fitting installed


Oil temperature sensor. P.S. I removed the sensor and added a copper crush washer later