Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


11-17-2011:

I have the fuel cap flange machine countersunk first, then drilled the skin for the drain flange. Have done all the drilling, time to deburr and dimple. Tonight, I finished deburring and dimpling the skin. I tried the fuel tank dimple die bought from Avery tools for the first time. Somehow, I feel the dimple is too deep, I kind doubt the sealant will fill the extra depth. Anyway, many people have used it and like it, so I will wait and see the result after the tank is done.

(Date in pictures is off by a month)



<<Previous |  Home | Next>>

Make a free website with Yola