Shawn Li's RV-7 Building Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


11-16-2011:

Not much time spent tonight, just drilled the fuel cap flange, and fabricated the vent line support that gets riveted to the fuel cap. I did a much better job than the first fuel tank.


Cap flange is clamped to skin

I used a wood block to clamp the cap flange in place, notice the cap is installed on the flange


Fuel cap flange is drilled


Vent line support is fabricated using a 7/32" drill bit to help the bend


Vent line support is clecoed to the flange


<<Previous |  Home | Next>>


Make a free website with Yola