11-17-2012: 3 hrs

After painting the cargo bulkhead, I riveted the wear blocks. Easy job here. Then I screwed the bulkhead to F706 bulkhead temporarily, just to realized that I missed the third nutplate on the F706 bulkhead vertical support. I drilled the third hole at the centerline somehow. I must misread the drawing. Anyway, I just mixed some JB weld and filled the hole. I will drilled the third hole at right place after the JB weld cured.

Then I installed Vans static ports. I wasn't sure if I need pull the pop rivet or just glue them to the fuselage. I figured if I pull the rivet, the protruded head will be short and fat, the clear plastic tube will have a hard time to slip in. Since I mixed JB weld alread to fill the holes on the cargo bulkhead, I decided I will just glue the pop rivet for static port to the fuselage using JB weld. This should be strong enough.

While waiting for the JB weld to cure, I moved onto the aft seat floor. I cut and drilled the hinges to the seat floor. Everything looks good here.



Vans pop rivet static port is clued to the fuselage skin using JB Weld


Inside view of the static port


Cargo walls are painted and temporarily installed


Wear blocks are riveted to cargo walls


Hinges are drilled with seat floors