Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


11-25-2013: 1.5 hrs



Cowling hinge on left side wall if fitted



Cowling hinge on top of firewall if clamped for drilling


Cowling hinge on top is drilled, the hinge is moved slighted fwd, hoping this is enough to hide the eyelet gap on the hinge when upper cowl is installed


<<Previous |  Home| Next>>

Make a free website with Yola