Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


11-27-2013: 2.5 hrs


Started working on the spinner today. Since I have constant speed prop, the installation is a little more involving. I have to cut the back plate. The cut out and trimming is time consuming, but it turned out great. However, I forgot to take a picture of the end product, just a picture before cutting the backplate.

Spinner backplate doubler is match drilled, the cutout line is marked


<<Previous |  Home| Next>>

Make a free website with Yola