Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-01-2013: 4 hrs

Fitted and trimmed upper cowl.


Hings are drilled to top skin


Another shot of the drilled hinges


Upper cowl is fitted to the fuselage. Note it overlaps with top skin right now.


Gap is set to 1/4"


Just a shot for no reason, I like this view


Trim line is marked per instruction


Gap on the right hand side is varying, I may have to live with it, or pad up later


Another view of the right hand side gap between upper cowl and spinner


Left hand side gap looks pretty good


Upper cowl is trimmed, the fit looks good


Upper and lower cowls are fitted at the front


<<Previous |  Home| Next>>

Make a free website with Yola