Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-04-2012: 2 hrs


Drilled safety wire hole on lip of the flap control rod that connects to motor. I will use 0.032" safety wire. Then fabricated F766B, C, and F785.


Safety wire hole is drilled


F766B clip, F766C plate, and F785B angle are fabricated


<<Previous |  Home | Next>>


Make a free website with Yola