Shawn Li's RV-7Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-07-2011:


A line 1/4" away from edge is drawn on the hinge half


A line 1/4" away from edge is drawn on the hinge half


Hinge is clamped to the flap assembly


Hinge is clamped to the flap assembly

Holes are drilled on the hinge


Spacer is clamped for drilling


Spacer is drilled


Flap assy is all drilled, need to deburr, dimple and rivet



<<Previous |  Home | Next>>


Make a free website with Yola