Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-07-2012: 2 hrs


F766 assembly is finished today. All parts are riveted and painted.


Used the car battery to move the flap actuator mid span


Nutplates are installed on F766A, F766C plate is also riveted to F766A




The #19 hole on F766A is enlarged to 5/8 for bolt head clearance. The hole on F766C plate is 1/4"


F766 assembly is done and painted

<<Previous |  Home | Next>>


Make a free website with Yola