12-08-2012: 4 hrs


Continued working on the flap control system. Almost done with it. Just need to wait for the paint to dry. I used a 12V battery to operate the actuator after everything is connected. It is fun to watch the flap actuator at work














Flap motro installed


Detail of safety wire


The covers are installed on 12-09-2012, but I just put the picture here