Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-16-2012: 2 hrs


I am about to mate the wing and fuselage, but the wing is not totally done yet. I need to do wiring and close bottom skins on the wings.

For wiring, after some thought, I will put following wires to the wing before closing bottom skins.

Left Wing:
1 #14 gage wire for landing light
1 #14 gage wire for taxi light
1 #18 3 connector shieled wire bundle for LN-201 Aero LED Pulsar NS90 Strobe/Nav light
1 #18gage wire for stall warner
2 #14 gage wires for heated pitot, power and ground
1 #18 gage wire for heated pitot indicator light
1 #20 gage spare
1 #18 gage wire for spare


Right Wing:
1 #14 gage wire for landing light
1 #14 gage wire for taxi light
1 #18 3 connector shieled wire bundle for LN-201 Aero LED Pulsar NS90 Strobe/Nav light
4 #22 gage wire for Dynon autopilot network data
2 #20 gage wires for ground and power
1 #20 gage for spare
1 #18 gage spare











<<Previous |  Home | Next>>


Make a free website with Yola