Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


01-01-2014: 3 hrs


Installed the baffles to engine for the last time. I tightened the screws by feel, then marked them with torque seal. Hopefully I don't need to remove them when finishing them up with the fabric air seals. I also made the four tension rods that hold the front and rear baffles around engine cylinders.


Baffle is installed for the last time


Tapping the tension rods for baffles


Tension rods are installed


Tension rods going under the engine cylinders


<<Previous |  Home | Next>>

Make a free website with Yola