Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


01-02-2014: 2 hrs

I cut paper template to fit the side baffles, then cut the rubber air seal fabric about 3.5" wide (suggested 3", I just want to leave some room). Then drilled #30 rivet holes on the side baffles at 1.5" spacing. Then riveted the air seal on. It's pretty straightforward. 








<<Previous |  Home| Next>>

Make a free website with Yola