Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


01-07-2014: 2 hrs


I thought the heat muff installation would be a quick session, but I was wrong. I had to take the end plates off 3 times to enlarge the through holes for the rods because the installed muff will rotate around the exhaust pipe after tightening the clamps. I had drill the holes to #21 for the muff to be tight enough.











<<Previous |  Home| Next>>

Make a free website with Yola