Shawn Li's RV-7 Construction Log
Home
Construction Log by Dates
Construction Deviation and Analysis
RV-7 In Action
Analysis
Phase I Log
On Going Maintenance
Maintenace Info
01-27-2014: 2 hrs
Horizontal stab tip is fitted
I had to re-do the elevator tip end closing. This time, I use the counter balance weight as a mold, laid fiber cloth directly on it, using a plastic bag as mold release
Picture for the right elevator tip
<<Previous
|
Home
|
Next>>
Make a
free website
with
Yola