Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


01-27-2014: 2 hrs




Horizontal stab tip is fitted


I had to re-do the elevator tip end closing. This time, I use the counter balance weight as a mold, laid fiber cloth directly on it, using a plastic bag as mold release


Picture for the right elevator tip



<<Previous |  Home| Next>>

Make a free website with Yola