Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


02-25-2014: 9 hrs

With my wife driving the gun, me laying down in the cockpit (not a pleasure place to lay down, trust me), we got the last skin riveted.



All riveting is done, finally


Seam looks pretty tight


Another shot of the finished top fuselage skin


In this picture, I was trying to show how tight the skin on the side, but it's kind blurry


My wife did a really good job handling the gun


<<Previous |  Home| Next>>

Make a free website with Yola