Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


02-26-2014: 2 hrs

The fuse hose I ordered from aircraft spruce is just 1-1/2" too long, I can't get it connected to the straight fitting on the outlet port of the red cube. I experimented different location, the best I can do without spending another $100 for a new hose is to replace the straight fitting with a 45-deg fitting, and relocated the red cube right at center of the front oil sump flange. Forgot to take a picture, but the red cube is always visible with lower cowl off.


<<Previous |  Home| Next>>

Make a free website with Yola