Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-03-2013: 3 hrs

Fuel vent lines are done, including the short line between fuel tank and fuselage. I wasted a lot of tubes trying to find the right shape for the vent line between tank and fuselage.



I bought this thread sealant from auto store. It will be used to seal fuel line


Vent line on left side is installed


Right tank to fuselage vent line on


Left tank to fuselage vent line on

<<Previous |  Home | Next>>


Make a free website with Yola