Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-18-2013: 2 hrs



The rudder stop I made per drawing dimension is short, I need to add this much material to make the rudder stop at the right position


Same on the right side


<<Previous |  Home | Next>>


Make a free website with Yola