Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-28-2015:

Dropped off airplane for paint job. The paint and process will be used are shown below. The paint is a Stewart Systems

  1. Washed and Cleaned Airplane with mild soap.
  2. Applied EkoEtch compound on the entire airplane; followed by a quick rinse
  3. Pressure washed the entire airplane to take away any etching compound on the surface
  4. Primed the aircraft with Smoke Grey Epoxy Primer
  5. Painted the aircraft with Eko-Crylick Insignia White 
  6. Applied Red Stripe with Eko-Crylic Pontiac Red
  7. Applied Grey Strip with Eko-crylic Smoke Grey
  8. Applied tail number using Eko-Crylic Insignia White




<<Previous |  Home| Next>>

Make a free website with Yola