05-31-2013: 2 hrs


Prosealed 8 post terminal block on the outboard bay under both seats. The terminal block will be used to join wires from wing to the wire bundle to avionics bay and instrument panel. I also glued some cable ties to the aft bottom skin to secure wires and manual trim cable. Then a few cable ties are glued to the seat rib on the center tunnel side. Wires will be tied to them to stay away from the elevator push rod.
 