Shawn Li's RV-7 Building Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


10-26-2011:

Placed order for a new right fuel tank, still mad at myself for a $500 mistake I made. Since I will be building a new fuel tank, what about the one I damaged. I probably will convert it to a table, using the bottom side as table top.

After spending some time or clean and organize the shop, I continued working on the aileron. I have the skeleton and skins match drilled, including the #30 holes attaching nose skin to the counterbalance weight pipe. I used WD40 as lubricant when I drill the pipe. It seemed to work well, the drill bit didn't get too hot.





Skins are clecoed on






 

<<Previous |  Home | Next>>

Make a free website with Yola